Back Home
Persistent Timer

Time and work

Q.No: 1
Test Name : CAT 2017 Actual Paper Slot 1

A person can complete a job in 120 days. He works alone on Day 1. On Day 2, he is joined by another person who also can complete the job in exactly 120 days. On Day 3, they are joined by another person of equal efficiency. Like this, everyday a new person with the same efficiency joins the work. How many days are required to complete the job?

Solution:
Q.No: 2
Test Name : CAT 2017 Actual Paper Slot 2

A tank has an inlet pipe and an outlet pipe. If the outlet pipe is closed then the inlet pipe fills the empty tank in 8 hours. If the outlet pipe is open then the inlet pipe fills the empty tank in 10 hours. If only the outlet pipe is open then in how many hours the full tank becomes half-full?

A
20
B
30
C
40
D
45
Solution:
Q.No: 3
Test Name : CAT 2017 Actual Paper Slot 2

Amal can complete a job in 10 days and Bimal can complete it in 8 days. Amal, Bimal and Kamal together complete the job in 4 days and are paid a total amount of Rs 1000 as remuneration. If this amount is shared by them in proportion to their work, then Kamal’s share, in rupees, is

A
100
B
200
C
300
D
400
Solution:
Q.No: 4
Test Name : CAT 2018 Actual Paper Slot 1

A tank is fitted with pipes, some filling it and the rest draining it. All filling pipes fill at the same rate, and all draining pipes drain at the same rate. The empty tank gets completely filled in 6 hours when 6 filling and 5 draining pipes are on, but this time becomes 60 hours when 5 filling and 6 draining pipes are on. In how many hours will the empty tank get completely filled when one draining and two filling pipes are on?

Solution:
Q.No: 5
Test Name : CAT 2018 Actual Paper Slot 1

When they work alone, B needs 25% more time to finish a job than A does. They two finish the job in 13 days in the following manner: A works alone till half the job is done, then A and B work together for four days, and finally B works alone to complete the remaining 5% of the job. In how many days can B alone finish the entire job?

A
16
B
18
C
20
D
22
Solution:
Q.No: 6
Test Name : CAT 2018 Actual Paper Slot 1

Humans and robots can both perform a job but at different efficiencies. Fifteen humans and five robots working together take thirty days to finish the job, whereas five humans and fifteen robots working together take sixty days to finish it. How many days will fifteen humans working together (without any robot) take to finish it?

A
45
B
32
C
40
D
36
Solution:
Q.No: 7
Test Name : CAT 2018 Actual Paper Slot 2

A water tank has inlets of two types A and B. All inlets of type A when open, bring in water at the same rate. All inlets of type B, when open, bring in water at the same rate. The empty tank is completely filled in 30 minutes if 10 inlets of type A and 45 inlets of type B are open, and in 1 hour if 8 inlets of type A and 18 inlets of type B are open. In how many minutes will the empty tank get completely filled if 7 inlets of type A and 27 inlets of type B are open?

Solution:
Q.No: 8
Test Name : CAT 2018 Actual Paper Slot 2

Ramesh and Ganesh can together complete a work in 16 days. After seven days of working together, Ramesh got sick and his efficiency fell by 30%. As a result, they completed the work in 17 days instead of 16 days. If Ganesh had worked alone after Ramesh got sick, in how many days would he have completed the remaining work?

A
12
B
13.5
C
14.5
D
11
Solution:
Q.No: 9
Test Name : CAT 2018 Actual Paper Slot 2

A tank is emptied everyday at a fixed time point. Immediately thereafter, either pump A or pump B or both start working until the tank is full. On Monday, A alone completed filling the tank at 8 pm. On Tuesday, B alone completed filling the tank at 6 pm. On Wednesday, A alone worked till 5 pm, and then B worked alone from 5 pm to 7 pm, to fill the tank. At what time was the tank filled on Thursday if both pumps were used simultaneously all along?

A
4:48 pm
B
4:24 pm
C
4:36 pm
D
4:12 pm
Solution:
Q.No: 10
Test Name : CAT 2019 Actual Paper Slot 1

At their usual efficiency levels, A and B together finish a task in 12 days. If A had worked half as efficiently as she usually does, and B had worked thrice as efficiently as he usually does, the task would have been completed in 9 days. How many days would A take to finish the task if she works alone at her usual efficiency?

A
18
B
36
C
12
D
24
Solution:
Q.No: 11
Test Name : CAT 2019 Actual Paper Slot 1

Three men and eight machines can finish a job in half the time taken by three machines and eight men to finish the same job. If two machines can finish the job in 13 days, then how many men can finish the job in 13 days?

Solution:
Q.No: 12
Test Name : CAT 2019 Actual Paper Slot 2

John gets Rs 57 per hour of regular work and Rs 114 per hour of overtime work. He works altogether 172 hours and his income from overtime hours is 15% of his income from regular hours. Then, for how many hours did he work overtime?

Solution:
Q.No: 13
Test Name : CAT 2019 Actual Paper Slot 2

Anil alone can do a job in 20 days while Sunil alone can do it in 40 days. Anil starts the job, and after 3 days, Sunil joins him. Again, after a few more days, Bimal joins them and they together finish the job. If Bimal has done 10% of the job, then in how many days was the job done?

A
14
B
15
C
12
D
13
Solution:
Q.No: 14
Test Name : CAT Actual Paper 2020 Slot-2

John takes twice as much time as Jack to finish a job. Jack and Jim together take one-thirds of the time to finish the job than John takes working alone. Moreover, in order to finish the job, John takes three days more than that taken by three of them working together. In how many days will Jim finish the job working alone?

Solution:
Q.No: 15
Test Name : CAT Actual Paper 2020 Slot-3

A contractor agreed to construct a 6 km road in 200 days. He employed 140 persons for the work. After 60 days, he realized that only 1.5 km road has been completed. How many additional people would he need to employ in order to finish the work exactly on time?

Solution:
Q.No: 16
Test Name : CAT Actual Paper 2021 Slot-1

Amar, Akbar and Anthony are working on a project. Working together Amar and Akbar can complete the project in 1 year, Akbar and Anthony can complete in 16 months, Anthony and Amar can complete in 2 years. If the person who is neither the fastest nor the slowest works alone, the time in months he will take to complete the project is

Solution:
Q.No: 17
Test Name : CAT Actual Paper 2021 Slot-1

Anu, Vinu and Manu can complete a work alone in 15 days, 12 days and 20 days, respectively. Vinu works everyday. Anu works only on alternate days starting from the first day while Manu works only on alternate days starting from the second day. Then, the number of days needed to complete the work is

A
8
B
5
C
7
D
6
Solution:
Q.No: 18
Test Name : CAT Actual Paper 2021 Slot-2

Two pipes A and B are attached to an empty water tank. Pipe A fills the tank while pipeB drains it. If pipe A is opened at 2 pm and pipe B is opened at 3 pm, then the tankbecomes full at 10 pm. Instead, if p ipe A is opened at 2 pm and pipe B is opened at 4pm, then the tank becomes full at 6 pm. If pipe B is not opened at all, then the time, inminutes, taken to fill the tank is

A
264
B
140
C
120
D
144
Solution:
Q.No: 19
Test Name : CAT Actual Paper 2021 Slot-2

Anil can paint a house in 60 days while Bimal can paint it in 84 days. Anil startspainting and after 10 days, Bimal and Charu join him. Together, they complete thepainting in 14 more days. If they are paid a total of ₹ 21000 for the job, then the shareof Charu, in INR, proportionate to the work done by him, is

A
9100
B
9150
C
9000
D
9200
Solution:
Q.No: 20
Test Name : CAT Actual Paper 2021 Slot-3

Anil can paint a house in 12 days while Barun can paint it in 16 days. Anil, Barun, and Chandu undertake to paint the house for ₹ 24000 and the three of them together complete the painting in 6 days. If Chandu is paid in proportion to the work done by him, then the amount in INR received by him is

Solution:
Given that Anil and Barun alone can do the work in 12 days and 16 days respectively.
Along with Chandu they complete the work in 6 days.
Let the total work be 48 units (LCM of 12 and 16).
Together they do 48/6 = 8 units in one day.
Out of these 8 units Anil does 48/12 = 4 units and Barun does 48/16 = 3 units.
So work done in a day by Chandu = 8 - 7 = 1 unit, which means Chandu takes 48 days to complete the work alone.
Ratio of wages of Anil : Barun : Chandu is in proportion to the work done = 4 : 3 : 1.
Hence, Chandu’s share = ⅛ x 24000 = Rs.3,000.
Q.No: 21
Test Name : CAT Actual Paper 2021 Slot-3

One day, Rahul started a work at 9 AM and Gautam joined him two hours later. They then worked together and completed the work at 5 PM the same day. If both had started at 9 AM and worked together, the work would have been completed 30 minutes earlier. Working alone, the time Rahul would have taken, in hours, to complete the work is

A
10
B
12
C
11.5
D
12.5
Solution:
Q.No: 22
Test Name : CAT Actual Paper 2022 Slot-2

Working alone, the times taken by Anu, Tanu and Manu to complete any job are in the ratio 5 : 8 : 10. They accept a job which they can finish in 4 days if they all work together for 8 hours per day. However, Anu and Tanu work together for the first 6 days, working 6 hours 40 minutes per day. Then, the number of hours that Manu will take to complete the remaining job working alone is

Solution:
Q.No: 23
Test Name : CAT Actual Paper 2022 Slot-3

Bob can finish a job in 40 days, if he works alone. Alex is twice as fast as Bob and thrice as fast as Cole in the same job. Suppose Alex and Bob work together on the first day, Bob and Cole work together on the second day, Cole and Alex work together on the third day, and then, they continue the work by repeating this three-day roster, with Alex and Bob working together on the fourth day, and so on. Then, the total number of days Alex would have worked when the job gets finished, is

Solution:
Since Bob can finish a job in 40 days.
Then, Alex and Cole can finish this job in 20 and 60 days respectively.
Total work = LCM (20, 40, 60) = 120 units Alex, Bob and Cole can finish 6, 3 and 2 units of the job per day.
In 3 days, they can finish 2(6 + 3 + 2) = 22 units In 15 days, they can finish 5 × 22 = 110 units Out of remaining 10, 9 units of work can finish by Alex and Bob and 1 unit by Bob and Cole.
Hence, the total number of days Alex would have worked when the job gets finished, is 2 × 5 + 1 = 11 days.
Q.No: 24
Test Name : CAT Actual Paper 2022 Slot-3

A group of N people worked on a project. They finished 35% of the project by working 7 hours a day for 10 days. Thereafter, 10 people left the group and the remaining people finished the rest of the project in 14 days by working 10 hours a day. Then the value of N is

A
36
B
140
C
23
D
150
Solution:
Q.No: 25
Test Name : CAT Actual Paper 2023 Slot 1

The amount of job that Amal, Sunil and Kamal can individually do in a day, are in harmonic progression. Kamal takes twice as much time as Amal to do the same amount of job. If Amal and Sunil work for 4 days and 9 days, respectively, Kamal needs to work for 16 days to finish the remaining job. Then the number of days Sunil will take to finish the job working alone, is

Solution:
Work done by Amal, Sunil and Kamal is in HP.
So time taken by Amal, Sunil and Kamal will be in AP.
Let Amal complete the work in n days.
Then, Kamal will complete the work in 2n days and Sunil will complete the work in (n + 2n)/2 = 1.5n days.
Ratio of time taken = n : 1.5n : 2n = 2 : 3 : 4
Ratio of work done = 1/2 : 1/3 : 1/4 = 6 : 4 : 3
Total units of work = 6 × 4 + 4 × 9 + 3 × 16 = 108
Hence, time taken by Sunil alone to complete the work is 108/4 = 27 days.
Q.No: 26
Test Name : CAT Actual Paper 2023 Slot 2

Pipes A and C are fill pipes while Pipe B is a drain pipe of a tank. Pipe B empties the full tank in one hour less than the time taken by Pipe A to fill the empty tank. When pipes A, B and C are turned on together, the empty tank is filled in two hours. If pipes B and C are turned on together when the tank is empty and Pipe B is turned off after one hour, then Pipe C takes another one hour and 15 minutes to fill the remaining tank. If Pipe A can fill the empty tank in less than five hours, then the time taken, in minutes, by Pipe C to fill the empty tank is

A
90
B
75
C
120
D
60
Solution:
Q.No: 27
Test Name : CAT Actual Paper 2023 Slot 3

Gautam and Suhani, working together, can finish a job in 20 days. If Gautam does only 60% of his usual work on a day, Suhani must do 150% of her usual work on that day to exactly make up for it. Then, the number of days required by the faster worker to complete the job working alone is

Solution:
Q.No: 28
Test Name : CAT Actual Paper 2023 Slot 3

Rahul, Rakshita and Gurmeet, working together, would have taken more than 7 days to finish a job. On the other hand, Rahul and Gurmeet, working together would have taken less than 15 days to finish the job. However, they all worked together for 6 days, followed by Rakshita, who worked alone for 3 more days to finish the job. If Rakshita had worked alone on the job, then the number of days she would have taken to finish the job, cannot be

A
17
B
21
C
16
D
20
Solution:
Solution:


Solution:


Solution:


Solution:


Solution:


Solution:


Solution:


Solution:


Solution:


Solution:


Solution:


Solution:


Solution:


Solution:


Solution:


Solution:


Solution:


Solution:


Solution:


Solution:
Given that Anil and Barun alone can do the work in 12 days and 16 days respectively.
Along with Chandu they complete the work in 6 days.
Let the total work be 48 units (LCM of 12 and 16).
Together they do 48/6 = 8 units in one day.
Out of these 8 units Anil does 48/12 = 4 units and Barun does 48/16 = 3 units.
So work done in a day by Chandu = 8 - 7 = 1 unit, which means Chandu takes 48 days to complete the work alone.
Ratio of wages of Anil : Barun : Chandu is in proportion to the work done = 4 : 3 : 1.
Hence, Chandu’s share = ⅛ x 24000 = Rs.3,000.


Solution:


Solution:


Solution:
Since Bob can finish a job in 40 days.
Then, Alex and Cole can finish this job in 20 and 60 days respectively.
Total work = LCM (20, 40, 60) = 120 units Alex, Bob and Cole can finish 6, 3 and 2 units of the job per day.
In 3 days, they can finish 2(6 + 3 + 2) = 22 units In 15 days, they can finish 5 × 22 = 110 units Out of remaining 10, 9 units of work can finish by Alex and Bob and 1 unit by Bob and Cole.
Hence, the total number of days Alex would have worked when the job gets finished, is 2 × 5 + 1 = 11 days.


Solution:


Solution:
Work done by Amal, Sunil and Kamal is in HP.
So time taken by Amal, Sunil and Kamal will be in AP.
Let Amal complete the work in n days.
Then, Kamal will complete the work in 2n days and Sunil will complete the work in (n + 2n)/2 = 1.5n days.
Ratio of time taken = n : 1.5n : 2n = 2 : 3 : 4
Ratio of work done = 1/2 : 1/3 : 1/4 = 6 : 4 : 3
Total units of work = 6 × 4 + 4 × 9 + 3 × 16 = 108
Hence, time taken by Sunil alone to complete the work is 108/4 = 27 days.


Solution:


Solution: